手順 5を翻訳中
手順5
-
Remove the screws from the arch holding the plunger arm and plunger tube in place.
-
Remove the plunger tube.
-
The orange nerf rail tooth and corresponding spring may fly out during the fix. If so, neatly set them aside, but make sure to reinstall during reassembly.
クリエイティブコモンズのオープンソース著作権のもと、あなたの投稿は著作権の対象となります。