メインコンテンツにスキップ

Lezyne CNC Dirt Floor Drive Gauge Replacement

必要な工具と部品

  1. Lezyne CNC Dirt Floor Drive Gauge Replacement, Removing the Gauge Cover: 手順 1、 2の画像 1 Lezyne CNC Dirt Floor Drive Gauge Replacement, Removing the Gauge Cover: 手順 1、 2の画像 2
    • Using a flat head screwdriver, pry up an edge of the gauge cover.

    • Remove the gauge cover.

  2. Lezyne CNC Dirt Floor Drive Gauge Replacement, Removing the Gauge Face Plate and Internals: 手順 2、 2の画像 1 Lezyne CNC Dirt Floor Drive Gauge Replacement, Removing the Gauge Face Plate and Internals: 手順 2、 2の画像 2
    • No parts from the old gauge will be re-used, so there is no need to attempt to preserve the parts. However, be careful not to damage the gauge housing.

    • Pry up a corner of the gauge face plate.

    • Use pliers to pull off the gauge face plate.

    • Be careful when prying off the face plate, as the edges are sharp.

    • Use pliers to remove the internal gauge mechanics.

  3. Lezyne CNC Dirt Floor Drive Gauge Replacement, Removing the Old Gauge: 手順 3、 2の画像 1 Lezyne CNC Dirt Floor Drive Gauge Replacement, Removing the Old Gauge: 手順 3、 2の画像 2
    • Using pliers, grip the exposed brass piece and unthread the gauge by rotating the gauge counter-clockwise.

    • Pull the gauge out of its housing.

  4. Lezyne CNC Dirt Floor Drive Gauge Replacement, Replacing the Gauge O-rings: 手順 4、 2の画像 1 Lezyne CNC Dirt Floor Drive Gauge Replacement, Replacing the Gauge O-rings: 手順 4、 2の画像 2
    • Remove the O-ring that is at the bottom of the threaded hole that the gauge threaded into.

    • Place a new O-ring into the hole.

  5. Lezyne CNC Dirt Floor Drive Gauge Replacement, Applying Threadlocker: 手順 5、 1の画像 1
    • Apply medium-strength Loctite (green, 290) to the threads of the new gauge.

  6. Lezyne CNC Dirt Floor Drive Gauge Replacement, Installing the New Gauge: 手順 6、 3の画像 1 Lezyne CNC Dirt Floor Drive Gauge Replacement, Installing the New Gauge: 手順 6、 3の画像 2 Lezyne CNC Dirt Floor Drive Gauge Replacement, Installing the New Gauge: 手順 6、 3の画像 3
    • Thread the new gauge into the floor pump by turning it clockwise in its housing.

    • Thread the gauge until it is snug and the BAR/psi markings are aligned with the pump body.

    • Gauge performance will not be affected by its position, so long as it is snug.

    • Allow at least 30 minutes for the thread locker to set.

    • Test pump to its highest rated pressure and listen for leaks. If you can hear leaks from the gauge, tighten it.

ゴール

ある他の人がこのガイドを完成しました。

作成者

1人の作成者と共同作成されました。

iRobot

メンバー登録日: 09/24/09

1 ポイント

636のガイドは作成済み

7 件のコメント

i use both gold and silver bracelets because for me, they are both great bracelets to wear;; <a href="https://www.chinamaijin.com/">cnc machining</a>

saif 77 - 返信

Its good  as your other  content  : D,  appreciate it for posting . <a href="https://www.chinamaijin.com/">cnc machining parts</a>

saif 77 - 返信

I feel nice about it and love learning more about this topic. <a href="https://certifiedbourbon.com/product/blu...">blue label for sale</a> I will come to your site to find out more and tell my acquaintances about you.


Biplob Chandra Singha - 返信

Nice information and good tips for SEO off-page optimization. I have got good tips to improve SEO off-page Optimization. Thanks for sharing! <a href="https://certifiedbourbon.com/product/pap...>pappy van winkle online</a> please keep it up Maintains!

legalweed suppliers - 返信

I was checking continuously this list and I’m impressed! Extremely useful info especially this blog commenting sites list. <a href="https://mushroomlux.com/product/dmt-cart...>purecybin dmt</a> Thank you and best of luck.

legalweed suppliers - 返信

コメントを追加

統計データ:

過去 24時間: 1

過去 7 日: 5

過去 30 日: 15

今までの合計 5,466