Abbott Architecture i2000 Preventative Maintenance Checklist
Sub-Process Bar 1
2
3
4
5
6
7
Reminders
Safety Warning - See Hazards Table
Picture/info below
Red Link = Live (Intranet)
Blue Link = Local (DVD Set)
GLYPH<c=8,font=/VUVAYG+Wingdings-Regular>
Video Indicator
-
L See Information Details
-
table
See Tools & Materials table
GLYPH<c=23,font=/VUVAYG+Wingdings-Regular>
i2000sr Service Manual
See
Contact Information
Overview i2000SR Annual Preventative Maintenance (@ISA 116-128C)
¦
- 1 Pre-Site Investigative Procedures
- 1.1 Review Abbottlink logs (if applicable) for issues
- 1.2 Prior to site visit, interview
1
for any on-going problems / issues
- 1.3 Assemble necessary parts
2 Initial On-Site Investigative Procedures
- 2.1 Wear appropriate PPE & follow safety requirements for area
- 2.2 Review customer logs noting any discrepancies
- 2.3 Review QC and Calibration history
- 2.4 Verify TSB and ISA status of instrument
- 2.5 Verify customer has current back-up to Hard Drive and CD
RV Loader
GLYPH<c=23,font=/VUVAYG+Wingdings-Regular>
(R&R A1.05---Live Link) / (R&R A1.05--Local Link)
- 3.1 Reference ISA 116-085(latest revision) for specific RV loader service / alignment as required
- 3.2 Clean (3) sensors on transport PCB 1 2 3
- 3.3 Inspect belts for alignment & cracks 3.4 Check bearing screw on loader wheel for tightness 4
- 3.5 Clean RV Wheel home sensor 4
- 3.6 When calibrating Loader (procedure on final pg.) ensure no RV's are present in the transporter or at the process path drop point
1 3.2
2
3.2
3
3.2
4 3.4 / 3.5
7 Hours
3
- 4 Wash Zone Diverter
GLYPH<c=23,font=/VUVAYG+Wingdings-Regular>
- 4.1 Clean and verify arm movement 5
- 4.2 Inspect for cracks or wear 4.3 Clean home sensor 6
- 4.4 Verify motor screws are tight
- 4.5 Inspect sensor cable (W161) for damage 4.6 Inspect & Seal electrical connectors with silicone compound as needed #
5
6
4.1
4.3
5 RV Load / Unload Diverter
GLYPH<c=23,font=/VUVAYG+Wingdings-Regular>
R&R B2.07 / 2.15---Live) / (R&R B2.07 / 2.15---Local)
- 5.1 Identify diverter as old / new style
- 5.3 Clean underside ridge, rotator, & paddle area 8
- 5.2 Clean Sensors 7
- 5.4 Inspect wires for cracks & wear 5.5 Inspect & Seal electrical connectors with silicone compound as needed #
- 5.6 NOTE: When mounted back to the PP cover, verify the R1 & Sample probes do not contact the wires when moving through the diverter assembly
7
5.2
Old Style
5.3
8
6 Stat Diverter
GLYPH<c=23,font=/VUVAYG+Wingdings-Regular>
(R&R B2.19---Live Link) / (R&R B2.19---Local Link)
- 6.1 Identify diverter as old / new style
- 6.3 Clean underside ARM & related area 10
- 6.2 Clean Shutter & Sensors 9
- 6.4 Inspect & Seal electrical connectors with silicone compound as needed #
10
6.3
Old Style
6.2
9
New Style
6.3 New Style
7 Home Sensor
GLYPH<c=23,font=/VUVAYG+Wingdings-Regular>
(R&R B1.05---Live Link) / (R&R B1.05---Local Link)
- 7.1 Clean Sensor 11
- 7.2 Inspect & Seal electrical connectors with silicone compound as needed #
- 11 7.1
10
- 8 Trigger / Pre-Trigger, WZ#1, WZ#2 Manifolds
GLYPH<c=23,font=/VUVAYG+Wingdings-Regular>
- 8.1 Clean & remove buffer build-up 12
(R&R G1.07--- Local Link)
- 8.1a Reference ISA 116-126 (latest revision) for cleaning procedure
- 8.1b Utilize wooden cuticle stick for heavy build-up removal and a soft tooth brush for finer substances
- 8.1c Caution should be taken around nozzle area to avoid altering the factory set angle 8.1d Reference video link for manifold cleaning tips GLYPH<c=8,font=/VUVAYG+Wingdings-Regular> ( Cleaning Washzone Manifold - Live Link)
- 8.2 Inspect for cracks, leakage, & broken components. Focus special attention to thermistor cables
- 8.3a Replace Trigger / Pre-Trigger valves with date code > 2yrs #
- 8.3 Inspect Trigger / Pre-Trigger Valves ONLY for date code verification 13
- 8.3b Example shown indicates a manufacturing date of November 2010 8.3c Write installation date on replacement Trigger / Pre-Trigger Valves for future 2 yr date verification 14
- 8.4 Inspect & Seal electrical connectors with silicone compound as needed #
12
13 8.3
8.1
14 8.3c
- 9 Process Path
- 9.1 Inspect Process Path under Wash Zone Manifolds & Diverters for buffer build-up
- 9.2 IF excess build-up is found continue to STEP 10
- 9.3 IF no excess build-up is found continue to STEP 13
- 9.4 NOTE : @The entire Process Path is recommended to be cleaned once per year regardless of build-up found
- 10 Process Path Top Cover
GLYPH<c=23,font=/VUVAYG+Wingdings-Regular>
(R&R B2.01--Live Link) / (R&R B2.01---Local Link)
- 10.1 Clean underside of buildup 15
- 10.2 Inspect for cracks & burrs
11 Process Path Disc
GLYPH<c=23,font=/VUVAYG+Wingdings-Regular>
(R&R B2.02---Live Link) / (R&R B2.02---Local Link)
- 11.1 Leave RV's in disc(inner track & both lanes of outer track) & rotate CCW observing for erratic movement 11.1a Special attention to lane change & WZ areas
- 11.2 Inspect disc / gear teeth for grooves, etching & wear 18
- 11.1b Areas of erratic movement should be noted for cleaning during step #11 (Process Path) 17
- 11.3 Confirm all disc holes are open & free of debris 18
- 11.3a A hex wrench slightly smaller than the holes can be utilized to remove any debris
16
11.1
17
11.1b
18 11.2 11.3
12 Process Path
- 12.1 Clean entire process path 19 20
- 12.1a Special attention to areas causing erratic RV movement
- 12.1b Common problem areas: wash zones, vortexers, diverters, 'S' curves, & optics 12.1c Reference video link for manifold cleaning tips GLYPH<c=8,font=/VUVAYG+Wingdings-Regular> ( Cleaning Process Path - Live Link)
- 12.1d Commonly used tools: wooden cuticle sticks, lint free wipes, soft bristle tooth brush, DI water, & swabs 12.1e NOTE: DO NOT use metal tools in the process path as